Installation and Relocation

Expert handling and precise setup for furnace installation projects

  • Safe and precise execution
  • Minimized downtime during installation
  • End-to-end project management

Why Choose Gaeda for Installation and Relocation

Installation and relocation of vacuum furnaces with full project control, from transport to commissioning. Minimize downtime and ensure reliable system restart.
A structured approach ensures accurate setup, efficient execution and a reliable system restart, while providing the opportunity to assess system condition and improve overall equipment performance.

Strategic planning and layout optimization

Each installation and relocation project is carefully planned, from site analysis to layout design. Optimized positioning and system integration ensure efficient workflows, safe operations and reliable long-term performance.

Opportunity for system check and upgrades

Relocation is the ideal moment to assess the condition of the furnace and its components, including hot zones, vacuum systems and control architecture. This allows identifying potential issues, performing targeted maintenance or implementing upgrades to improve performance and reliability.

Fast execution to minimize downtime

Time is a critical factor during installation and relocation projects. Efficient planning and coordinated execution reduce downtime and ensure a controlled and predictable return to production.

A Gaeda technician while relocating a vacuum furnace

Complete Turnkey Solutions from Transport to Commissioning

A turnkey approach ensures full control of every phase, from planning and transport to installation and commissioning.
Each project is managed as a complete process, ensuring coordination across all phases, reducing risks and enabling a smooth and controlled system restart.

Installation

Installation is managed as a structured workflow, from positioning and mechanical assembly to commissioning, system validation and functional checks of all subsystems.
Beyond setup, this phase also represents an opportunity to train operators directly on site, ensuring correct use of the furnace, improved process control and long-term operational efficiency.

Relocation

Relocation projects are handled with a comprehensive approach, including dismantling, transport, reinstallation and system restart, with full verification of system integrity and alignment.
This phase also provides a valuable opportunity to assess the condition of the furnace, perform a technical check and implement targeted upgrades or improvements to enhance performance, reliability and efficiency.
Particular attention is given to critical components such as sealing systems, vacuum lines and cooling systems.

Contact our team

Frequently Asked Questions

Planning a new installation or relocating your furnace?
Read the answers to common questions about setup, transfer and commissioning.

Downtime is reduced through detailed planning, phased execution and efficient coordination of all activities.

Preparation before shutdown and optimized on-site operations help shorten installation and restart times.

Yes. A turnkey approach covers all phases, including dismantling, transport, installation, commissioning and system restart.

This ensures full control of the project and reduces coordination complexity across all involved activities.

Yes. Relocation is an ideal moment to assess the condition of the equipment.

It allows performing technical checks, replacing critical components and upgrading key subsystems where required.

Yes. On-site training can be included during installation and commissioning.

This ensures operators are fully familiar with the system, improving process control, safety and long-term operational performance.

Do you want to be operational from day one after installation?

Prepare your operators with hands-on training on your equipment during installation.